Special Projects – Excel, Olympics 2012 TONE were contracted to provide a temporary walkway, approximately 160m long, to gain access to the Excel building from the train station for the 2012 Olympics. The ramp was constructed with Tube and Fitting scaffolding. It was...
Special Projects – Farringdon Station Farringdon Stations’ roof needed to be replaced, as it was 150 years old. TONE Scaffolding were contracted to supply a huge access scaffold that spanned two Underground tracks and two Network Rail tracks within Farringdon station....